OEM Bimini Top Cap Fitting Marine Hardware Stainless Steel Dome Top
Welcome to customize. Stainless Steel Marine Hardware Fittings Bimini Tops Cap Boat Accessories Premium bimini tops hard
Basic Info.
Model NO. | Customized |
Surface Roughness | Ra0.05 |
Machining Tolerance | +/-0.01mm |
Standard | AISI |
Certification | CE, RoHS, ISO 9001:2008 |
Product Name | Eye End Cap |
Transport Package | Cartons |
Specification | CE, ROHS, SGS |
Trademark | Ablinox |
Origin | Guangdong, China |
HS Code | 3926909090 |
Production Capacity | 180-250ton/Month |
Product Description
Welcome to customize.
Stainless Steel Marine Hardware Fittings Bimini Tops Cap Boat Accessories
Premium bimini tops hardware with the best value, outstanding design and high quality.
* 2 PCS 1" Bimini Top Caps , Eye End Top Fitting Marine 316 Stainless Steel Bimini Canopy Hardware* Fits 1" OD round tubing* High quality 316 stainless steel* Corrosion-resistant* Surface polishing* Long life-spanPackage Includes:
2 x Stainless Steel 1" Eye End CapHardware and instruction / installation manual not included.Note:Be sure to approve the metric size chart to avoid the problem of size mismatch.
Material Components | ||||||
Chemical Composition of Material | Material Composition | 201 | 202 | 304 | 316 | 430 |
C | ≤0.15 | ≤0.15 | ≤0.08 | ≤0.035 | ≤0.12 | |
Si | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | ≤1.00 | |
Mn | 5.5-7.5 | 7.5-10 | ≤2.00 | ≤2.00 | ≤1.00 | |
P | ≤0.06 | ≤0.06 | ≤0.045 | ≤0.045 | ≤0.040 | |
S | ≤0.03 | ≤0.03 | ≤0.030 | ≤0.030 | ≤0.030 | |
Cr | 13-15 | 14-17 | 18-20 | 16-18 | 16-18 | |
Ni | 0.7-1.1 | 3.5-4.5 | 8-10 | 10-12 | ||
Mo | 2.0-3.0 | |||||
Mechanical Property | Material Item | 201 | 202 | 304 | 316 | |
Tensile Strength | ≥535 | ≥520 | ≥520 | ≥520 | ||
Yield Strength | ≥245 | ≥205 | ≥205 | ≥205 | ||
Extension | ≥30% | ≥30% | ≥35% | ≥35% | ||
Hardness (HV) | <105<> | <100<> | <90<> | <90<> |
Company IntroductionABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop. In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world. In 2012, We have sold our products to more than 200 countries, and our brand existedin more than 50 countries in the world. In 2013, We have passed CUPC, NSF, CE and ROHS certificates,starting entered into the European and American markets. In 2014, with the fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining types of equipment. In 2015, We set up our management team. We have cooperated with some universities and getting bigger. At the same time, we are also Alibaba training center.From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001certificate. we have already cooperated with some top 500 enterprises. 2018, ABL focus more on Lean Production and preparing for the next five years.2019, We are going to build a testing center and achieve a higher sales goal.
Production Process
Steps | Time | |
Tooling Making | CNC Center | 7 days |
Casting Process | Wax Injection | 2 days |
Sand Shell Molding | 5 days | |
Dewaxing | 1 days | |
Pouring | 1 days | |
Cutting | 1 days | |
Grinding | 1 days | |
Cleaning | 1 days | |
Machining Process | CNC | 2 days |
Drilling & Tapping | 2 days | |
Welding | 2 days | |
Stamping | 1 days | |
Polishing | 5 days | |
Assembling | Ultrasonic Washing | 1 days |
Water Testing | 1 days | |
Assembling | 2 days | |
Remark: The production time base on standard quantity and process |
- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
- Reply you fast within 12 hours.
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.
2, What is your payment term?We do T/T, 30% deposit, balance before delivery. We can also accept L/C.
3, What is the production time?Casting part need 20 to 30 days.Balustrade and handrail accessories need 25 to 35 days.Faucet and shower need 40 to 60 days.
4, Is that possible to visit the factory?Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.
Send to us